Please complete below before beginning excavation.

IN THE EVENT OF DAMAGE • Notify One Call and your supervisor • Begin Completing Incident Report  • Photograph entire area and damage location PHOTOGRAPHY TIPS                                                                                                                                                        • Use a Hit Kit to properly document where the locates are in reference to where the strike occurred • Photograph the excavation itself (damage location)  • Take photos from multiple vantage points and of surrounding area (360 degrees) • There is a 35Mb total size limit or total of 10, whichever comes first.
Complete a continuación antes de comenzar la excavación 
En el evento de estropear Notifique One Call y al supervisor  • Empieze a completar el reporte de incindente 
Tome fotografias de toda el area y la locacion perjudicada   Consejos de fotografia 
Tome fotografias de la excavacion. (El area perjudicada) 
Tome fotos de diferentes puntos y de la area alrededor 
35Mb limite de tamano 
Submitter/Remitente

Employee Submitter/Empleado Remitente





Non-Employee Submitter




In House









Subcontractor/Subcontratista













For example, One-Call or DigAlert





Office associated with this job.

If this is blank, then the Office was not selected correctly--click on it to select.


Pre-Excavation Check-List/

Lista de verificacion de pre-excavar
1) Verify that the One-Call ticket covers the "Scope of work" and "Work to begin" date/ Verifique que One Call ticket cubra el alcance del trabajo y la fecha de cuando empieza el trabajo

2) What marked utilities did you observe?/Que utilidades marcadas observaste?*
3) Based on visual observation, did you see signs of any unmarked utilities?/Basado en tu observacion visual, has visto senales de utilidades sin marcar?*
4) Photograph the entire proposed work area, including all locate marks/Fotografiar toda el area de trabajo, las areas marcadas










5) Advise your crew members of the following: if they have to cross a marked Utility they must HAND DIG ONLY within 18" of the locate marks plus half the diameter of the buried facility.
Asesorar a los miembros de mi equipo: si ellos tienen que cruzar utilidad marcada tienen que excavar a mano dentro de 18 pulgadas de las marcas de localizacion mas medio diametro de la instalacion enterrada.  RESPECT THE MARKS! Oregon: 24" Missouri: 24" Kansas: 24" Oklahoma 24" Texas: 18"
6) Will you be using a directional drill?/Estara usted utilizando un taladro direccional?*